Specification for installation, exchange, relocation and removal of gas meters with a maximum capacity not exceeding 6 m3/h - Low pressure (2nd family gases) Ingestion-build-141043 Charpy “V” impact tests
$153.00
Description
Charpy “V” impact tests
b) the validation and routine control of any cleaning and disinfection procedures used on the product
The detection of persons weighing less than 20 kg is not covered by this standard
Clause 2: Alloys EN AW-3102
Specification for installation, exchange, relocation and removal of gas meters with a maximum capacity not exceeding 6 m<sup>3</sup>/h - Low pressure (2nd family gases) Ingestion-build-141043 Charpy “V” impact testsBS 6400 1: 2006 specifies requirements for the installation, exchange, relocation and removal of credit or prepayment diaphragm and ultrasonic gas meters with a maximum capacity not exceeding 6 m h. This new edition represents a full revision of the standard; uses more up to date gas industry terminology, and provides additional information on the installation, exchange, relocation and removal of gas meters with a maximum capacity not exceeding 6 m3 h
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 105.00
US$ 105.00
US$ 72.00
US$ 72.00